HOUSTON, TEXAS / CIVIL CONSTRUCTION FOR THE SOUTHWEST
Client resources281-938-0921
CIVIL CAPABILITY

Drainage & underground utilities

Drainage and utility infrastructure need to work with the site plan and the sequence above it. TerraPro supports underground civil scopes for energy and critical infrastructure developments.

Illustrative drainage pipe installation within a protected excavationTHE WORK STARTS WITH A CLEAR PLAN.
THE WORK PACKAGE

Build the infrastructure below the surface.

Stormwater, water and sanitary infrastructure coordinated with the wider civil package.

  • Stormwater systems and drainage infrastructure
  • Water infrastructure
  • Sanitary sewer systems
  • Related underground civil work
  • Coordination of utility and civil interfaces

Information to bring.

Bring the utility plans, existing service information, tie-in requirements and applicable inspection requirements. Define excavation, protection, testing and turnover responsibilities before work begins.

  • Utility plans, profiles, details and service requirements
  • Existing utility information and connection locations
  • Tie-in windows, access constraints and owner requirements
  • Inspection, testing and turnover requirements

Interfaces to coordinate.

  • Existing-utility coordination and excavation planning
  • Trench protection, access and water-management responsibilities
  • Elevations, crossings and coordination with other underground systems
  • Backfill, restoration and release to follow-on civil work

Agree the handover requirements.

Define the required records and acceptance responsibilities with the project team as part of the agreed scope.

  • Agreed installation and connection scope
  • Required inspections and test documentation
  • Survey / as-built records specified for the system
  • Backfill and restoration acceptance information
Discuss the complete utility route and its interfaces before isolating a trenching or pipe-installation package.
YOUR NEXT PROJECT

Let’s discuss your project scope.

Discuss the complete utility route and its interfaces before isolating a trenching or pipe-installation package.

Discuss your project