HOUSTON, TEXAS / CIVIL CONSTRUCTION FOR THE SOUTHWEST
Client resources281-938-0921
CIVIL CAPABILITY

Structural concrete

Equipment and infrastructure depend on the foundations beneath them. TerraPro provides structural concrete scopes aligned with the requirements of energy and infrastructure projects.

Illustrative inspection of reinforcing and anchor bolts before a foundation pourTHE WORK STARTS WITH A CLEAR PLAN.
THE WORK PACKAGE

Foundations for critical assets.

Equipment foundations, pads and structural concrete supporting energy infrastructure.

  • Equipment foundations
  • Concrete equipment pads
  • Structural concrete for energy facilities
  • Structural concrete for infrastructure developments

Information to bring.

Review issued designs, embed and anchor requirements, equipment interfaces, access and schedule. Agree on inspection, testing and concrete documentation requirements with the project team.

  • Issued foundation drawings, details and specifications
  • Equipment loads, embeds, anchors and vendor interfaces
  • Inspection and testing requirements
  • Pour sequence, access and required foundation-release dates

Interfaces to coordinate.

  • Survey control and foundation layout
  • Reinforcing, embed and anchor coordination
  • Concrete placement, testing and curing requirements
  • Equipment-setting tolerances and follow-on installation

Agree the handover requirements.

Define the required records and acceptance responsibilities with the project team as part of the agreed scope.

  • Pre-pour checks and specified inspection records
  • Concrete testing and placement documentation
  • Embed / anchor and survey information, where required
  • Foundation handoff and outstanding-item closeout
Equipment readiness depends on foundation details being coordinated early, from anchors and elevations to the installation sequence.
YOUR NEXT PROJECT

Let’s discuss your project scope.

Equipment readiness depends on foundation details being coordinated early, from anchors and elevations to the installation sequence.

Discuss your project